Demonstration Wall Finally Completed (June 2016)

The final fitting of the demonstration wall at Smithers Rapra has been completed.

Canopy1

A canopy has been installed which consists of a heavy steel beam removing the need to fix it to the roof.

This canopy will protect the top of the insulation against moisture and rainfall which could potentially affect the adhesive usedĀ for the insulation.

Canopy2

Conditions will continue to be monitored using the time lapse camera for a period of six months after which time the data will be reported on.